Flat Roof Installation & Replacement

A new roof is one of the largest single line items a building owner signs off on. You should be able to see exactly what you're buying — the assembly, the scope, the schedule — before anything comes off.

First question

Does it actually need
replacing?

Sometimes the answer is no, and we'll tell you. A roof with service life left and a localized problem is a repair, not a capital project.

Replace

The insulation is wet

Once water is in the insulation, patching the membrane above it changes nothing. We core the assembly to find out rather than guess from the surface.

Replace

Failures across the whole field

Multiple splits, widespread blistering or seams letting go in several places means the membrane is at end of life, not damaged in one spot.

Replace

You're repairing it every year

When the annual repair bill starts approaching a fraction of replacement cost, you're renting a roof at a bad rate.

Repair

One seam, one flashing, one drain

Localized failure on an otherwise sound membrane with years left. See repair & leak investigation.

Repair

Storm damage in one area

Hail or wind damage confined to a section can often be cut in and repaired without touching the rest of the field.

Depends

The roof is simply old

Age alone doesn't decide it. A well-maintained 22-year-old roof can outlast a neglected 14-year-old one. Condition decides, not the calendar.

What goes into the assembly

A flat roof is not one product, it's a stack — and most failures come from the layers you can't see rather than the membrane you can.

  • Structural deck — steel, concrete or wood. Its condition is only fully known once the old assembly is off.
  • Vapour barrier — stops warm, moist interior air reaching the cold side of the assembly. Get this wrong in Alberta and you condense water inside your own roof.
  • Insulation — thermal performance and, importantly, the slope that moves water to the drains. Tapered insulation is often how ponding gets solved.
  • Cover board — a hard, stable surface for the membrane and protection against foot traffic and hail impact.
  • Membrane — SBS, TPO, EPDM, CBC or built-up. See systems compared.
  • Flashings and terminations — parapets, curbs, penetrations, edge metal. This is where roofs actually fail.
  • Drainage — drains, scuppers, overflow provision. A roof that can't shed water fails early no matter what's on top.

Tear-off or overlay?

An overlay — installing over the existing assembly — is cheaper, faster and produces far less waste. It's a legitimate option when the existing roof is dry, the deck is sound, and code allows the additional layer.

It is the wrong option when there's moisture in the assembly. Covering wet insulation traps the water, and you've paid to bury a problem that will surface again with less of your budget left to deal with it. We core the roof and tell you which situation you're actually in.

Ask any contractor proposing an overlay: did you core the assembly, and what did you find? If the answer is vague, that's your answer.

How the job runs

  1. Assessment and coring. We identify the existing system, check drains, seams, flashings and penetrations, and core the assembly to find out what's underneath.
  2. Itemized scope and quote. Tear-off, disposal, insulation, membrane, flashings, drains, and anything conditional — written down, line by line, so you can see what's included and what isn't.
  3. Scheduling around your building. Access, staging, crane or hoist requirements, material handling and noisy work planned against your operating hours. Tenant notice where it's needed.
  4. Tear-off in sections. We only open what we can close. The roof is tied in watertight at the end of every working day — not just at the end of the job.
  5. Assembly installation. Vapour barrier, insulation and tapered slope, cover board, membrane, then the detail work at every curb, drain and parapet.
  6. Inspection and handover. Final walk, photographs, warranty documentation, and a maintenance schedule that keeps the manufacturer coverage enforceable.

On weather: membrane installation is temperature and moisture dependent. There are conditions in an Edmonton winter where a proper install simply is not possible, and we'll say so rather than install something that fails in three years. Emergency stabilization, on the other hand, happens whenever you need it.

What drives the price

  • Roof area — and how much is open field versus detail work
  • Tear-off versus overlay, and the disposal volume that follows
  • Deck condition once the old assembly is off
  • Insulation required to meet current code, and whether tapered slope is needed
  • The membrane system specified
  • Access and height — crane, hoist or stairs materially changes labour
  • Count of penetrations, curbs, drains and parapet details
  • Working around occupancy, restricted hours or tenant constraints

Our own work

Installs on Edmonton buildings.

Real iRoof jobs — no stock imagery.

Torch-welding an SBS modified bitumen membrane roll on an Edmonton commercial flat roof
Torch-on SBS application
Flat roof membrane installation in progress in Edmonton with parapet detailing and guardrail fall protection
Install in progress, guardrail up
Completed granulated cap sheet roof in Edmonton with vents and curbs detailed
Completed cap sheet

Questions

Installation, answered.

It depends on roof area, access, deck condition and weather windows. A straightforward mid-size commercial field is usually measured in weeks rather than months. You get a scheduled window in the quote, and we tell you immediately if weather moves it.

Almost never. Most of our commercial work happens on occupied buildings. Staging, access and the noisiest operations get planned around your hours, and we coordinate anything affecting tenants in advance.

We only open what we can close. The roof is tied in watertight at the end of every working day, so an overnight change in weather doesn't put water into your building. Schedules can move; watertightness doesn't.

Yes, where the scope requires them. Permit requirements and any code-driven insulation upgrades are identified during the assessment so they're in the quote rather than appearing later as a surprise.

Two, and they're different. The manufacturer warranty covers the membrane itself; our workmanship warranty covers the installation, which is where most failures originate. Both are issued in writing. Note that manufacturer coverage typically requires documented maintenance to stay valid — see maintenance programs. Our workmanship warranty runs 5 years.

Next step

Find out what it actually needs.

Free assessment, itemized scope, no obligation.